Back to blog
Estimation Planning Project Management Hiring Best Practices

What's Not Included in a Software Quote, and Why the List Protects You

By Ken B Portfolio · Published on November 17, 2026
Illustration of a developer working at a laptop

Most project disputes don’t start with bad code. They start with something nobody wrote down.

You thought the price covered the logo, the hosting bill and fixes for a year. The developer thought it covered the app. Both were reasonable guesses, and the gap shows up on an invoice.

A written list of what is in, and what is not, closes that gap before work starts. Here is the full list of what a software quote usually leaves out, why, and how each item gets handled instead.

Why “not included” is a good sign

A quote with no exclusions is not a bigger deal. It is a vaguer one. Every item below either gets priced, gets paid to someone else, or becomes a fight later. The list just decides which, early.

It is the same habit that makes an honest estimate: measure the work, and write down the edges.

Outside bills

Paid by you, directly, to the service. Never hidden inside the developer’s price.

  • Hosting and the database. Monthly, and it grows with use.
  • Domain names and email addresses.
  • Email and text-message sending. Billed per message by the sending service.
  • AI usage. Billed per use by the AI provider. A good build caps it per customer, so one heavy user can’t run up the bill.
  • Paid APIs and plugins. Maps, payments, search, any service charged per call or per seat.
  • Payment fees. The payment provider takes a cut of each sale.
  • App store fees, if there is a phone app.
  • Licences. Fonts, stock photos, icon sets, paid templates.

How it’s handled: the accounts are opened in your name, so you own them and see every bill. You get one page listing each service and its price. What a good handoff includes

Content

The app is the container. What goes in it is yours.

  • Words. Page text, emails, help text, onboarding.
  • Images and video. Photos, product shots, demo videos.
  • Product data. Prices, catalogues, the starting records the app needs.
  • Legal pages. Privacy policy and terms. A developer can put them in place, but a lawyer should write them.
  • Translations into other languages.

How it’s handled: a short list of what content is needed, and by when. Placeholder text holds the space until yours arrives.

Design and brand

  • Logo and brand identity. Colors, fonts and tone, if you don’t have them yet.
  • Marketing site design, when the quote is for the app itself.
  • Custom illustrations or animation.

How it’s handled: screen design inside the app is usually in. Brand work is a separate piece, or comes from a brand designer. How I set up the design system for your project

Moving old data

  • Importing from an old system or spreadsheets. Old data is messy: duplicates, missing fields, formats that don’t match.
  • Cleaning it up before the import.

How it’s handled: sized on its own after looking at a sample, because the mess decides the cost.

Changes after the list is agreed

  • New features that weren’t on the list.
  • A changed decision. Something built as agreed, then asked for differently.
  • “Small” additions. A new field can mean a new screen, a database change and new tests.

How it’s handled: each change is sized as a new piece, and you choose what it’s worth. The first estimate stays honest instead of quietly growing.

Support after launch

  • Fixes after the warranty ends. I include a bug-fix warranty: 30 days at my $35 rate, or 90 days at $60. After that, fixes are new work.
  • What a warranty covers: bugs in what was built. Not new features, not changes asked for later, and not problems caused by someone else’s edits or by an outside service going down.
  • Ongoing upkeep. Security updates, updating the tools the app is built on, watching the servers. An app that nobody looks after slowly breaks.
  • Being on call. Nights and weekends are not covered unless agreed.
  • Support for your users. Answering their emails and questions is your team’s job, with the help pages to point them to.

How it’s handled: a monthly upkeep plan, or hourly work when needed. Keeping automations running when no one is watching

Reach beyond the agreed scope

  • Devices and browsers outside the agreed list, such as very old browsers.
  • Traffic far beyond the plan. An app built for hundreds of users may need work before it serves hundreds of thousands. The SaaS scaling readiness checklist
  • A phone app when the quote is for a web app.
  • Integrations not on the list. Each outside service is its own piece of work.

Certifications and specialist work

  • Compliance audits. SOC 2, HIPAA, PCI. A developer can build to the rules; the audit and the certificate come from an outside firm.
  • Legal advice on privacy or data laws.
  • An outside security test, by a firm that tries to break in. Security checks during the build are in. Understanding security in your SaaS
  • A formal accessibility audit. Building accessible screens is in; a certified audit is separate.

Growth work

  • SEO, ads and marketing.
  • Analytics beyond the basics, like full tracking plans and dashboards.
  • App store listings, screenshots, and waiting on store reviews.

Things nobody controls

  • Waiting on answers. If a decision takes a week, the work waits a week.
  • Outside services changing. A provider changes its rules or prices, or shuts down a feature.
  • Outside outages. When a service the app depends on is down, the app is affected too.

How it’s handled: written down as known risks, so a delay has a reason on paper instead of a blame.

What is usually in

To be fair to the list, here is what a full stack quote should include:

  • The screens, the server, the database and the agreed integrations.
  • Tests, and security checks during the build.
  • Setting up hosting, the database and the outside accounts, in your name.
  • Three copies of the app: one to build on, one to test, and the live one.
  • A handoff your next developer can work from.
  • A bug-fix warranty for a set period after launch.

How I handle it

  • A first small paid milestone answers the open questions and measures the work. You get the written in and out list with it, and you can stop there.
  • Hourly while the work is still unknown, a fixed price once it is measured.
  • Changes are sized as new pieces, so you always see the cost before saying yes.
  • Outside bills are yours, directly, never marked up inside my price.
  • I work Monday to Friday, 7am to 6pm Eastern, and reply within 24 hours on weekdays.

Questions to ask about any quote

  1. Is there a written list of what is not included?
  2. Which outside bills will I pay, and roughly how much?
  3. What does the warranty cover, and for how long?
  4. How is a change priced?
  5. Who owns the accounts and the code at the end?

If the answer to the first one is no, ask for it before you sign.

The short version

Every quote leaves things out. The good ones say what, and how each item is handled: priced separately, paid to someone else, or written down as a risk. Outside bills are yours and visible, changes are new pieces, and the warranty has clear edges.

Which of these did your last quote leave unsaid?

GETYOURINANDOUTLIST

Tell me what your first version must do, and I'll send back a draft list of what is in and what is out.

More Posts

All posts